Contact us

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

Explore Fully Documented
Construction Projects

Category
Country
Clear All
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

Items in view: 2

Showing items 1 to 3 of 6

Filtering by:
Tag
Operator
Value
View Project
Dublin
,
Ireland
7/30/20

Greenogue Logistics Park

Commercial
Industrial

Greenogue Logistics Park is the latest prime logistics development in Dublin. It has private access to all outgoing and incoming routes from all major transportation routes.

The development is being done on a total area of 23.8 acres comprising two separate warehousing/logistics sites (Site A and B) and associated access roads and services including footpaths, grass margins, boundary treatments, access gates, ESB stations, public lighting, and all the associated service ducting and landscaping.

The total land area for Site A will be 15,476m2 and site B will cover a floor of 26,613m2. The buildings will be completed to the highest specification incorporating substantial green credentials. Each building will be BER A2 certified and will also be finished to LEED certification.

Camera view of Unit A construction site
Evercam Camera view of Unit A construction site

Evercam cameras have been installed on the construction site of the two different units of Greenouge logistics park to record and monitor the construction process completely.

Camera view of Unit A construction site
Camera view of Unit B construction in progress
View Project
Moorgate
,
United Kingdom
8/11/20

Zinc Media Office Fitout

Commercial
Completed
Fit Out

Watch the renovation of category A office space into a fully functioning office.

Located at 17 Dominion Street a modern office building at the northern end of Moorgate within the traditional London City core.

Take a look at the speedy progress being made over a short period of time with these before & after images:

View Project
Dublin
,
Ireland
8/31/20

National Children’s Hospital

Healthcare Pharma
Public Sector Utilities

The new children's hospital is currently under construction by BAM Ireland on the campus of St James' Hospital in Dublin.

The new hospital will be seven storeys high. Including the underground car park with 1,000 spaces, there are about 160,000 m2 of accommodation with 6,150 rooms. There are 380 individual inpatient rooms each with en-suite facilities and a bed for a parent or carer to sleep on.

There are also 20 child and adolescent mental health beds for patients with eating disorders and acute mental health problems, 93 day beds and 22 operating theatres, some with specialised facilities and a hospital school.

As the main contractor of the development, BAM Ireland opted to use Evercam as an innovative tool for project management, marketing and dispute avoidance all through the use of construction cameras. Our partnership aims to provide the best service throughout the development by providing a visual audit for the whole duration of the project.

BIM integration: Combine the BIM model with the real building
BIM integration: Combine the BIM model with the real building

We’re proud to work on the National Children Hospital project supporting BAM in the most significant capital investment project ever undertaken in healthcare in Ireland.

View Project
Dublin
,
Ireland
8/31/20

The Guinness Enterprise Centre

Commercial

The Guinness Enterprise Center (GEC) really got started in 2000 with the aspiration of giving the earth and all the essential backings to empower the beginning time business' to develop and flourish. It has been the launchpad for several fruitful new businesses in Ireland, a significant number of which currently have a worldwide impression. It is right now home to 85 organizations with in excess of 400 workers on location.

Computer Generated Image of The Guinness Enterprise Centre
Computer Generated Image, created by uniqueAT

The building is leaving on a significant extension that will practically twofold limit. When finished, the extended advancement will see the GEC getting home to 160 new businesses with 750 representatives and a further of 220 co-working companies.

Evercam Cameras were installed on the construction site once the project started. It was there to record everything and every incident occurring on the construction site, the recordings are done in high-resolution and in the cloud.

The timelapse videos of the timelapse are produced every month by a team of professionals during the whole project. By having access to the live view and recordings our client Flynn Management and Construction makes sure to keep all the people involved in the project on the same platform.

Guinness Enterprise Center Expansion Launch Video:

https://www.youtube.com/watch?v=PvXeRgKHLgE&feature=youtu.be

View Project
Dublin
,
Ireland
8/11/20

The Eight Building

Commercial

The Eight building is a project consisting of 75,000 SQ FT of Grade A High Specification Offices and a retail market on the ground floor.

The project consists of newly built office & retail market for the iconic Newmarket Square for Dublin 8. This central and well-established area of Dublin has been the most important part of Dublin City's history.

CGI image of The Eight Building
CGI image of The Eight Building

Evercam has installed its camera to record and monitor the construction process from the demolition to the construction of the new building.

This new office has an area of more than 75,000 sq. The floor coverings range from 3000 sq. Ft to 16,000 sq ft, which can handle a single tenancy or a split floor. The Eight Building contains approx. 350 m2 of terrace space across 3 Floors.

View Project
Dublin
,
Ireland
9/3/20

Project Kells

Commercial

Sisk Ireland's leading contractor is a creative multinational construction and engineering company with a 160-year history spanning three generations. The family business has stayed true to John Sisk's dream of delivering extremely high standards of construction knowledge and customer satisfaction by hiring, educating, and empowering qualified workers.

The Project kells construction work has begun and is underway to extend Grafton Street-style shopping to adjacent Nassau Street for around 5,000 m2 of retail space.

a CGI image of the sisk Project Kells
CGI Image of Kells Project

The renovation of the low-density site at the Nassau Street and Dawson Street axis would also include approximately 16,000m2 of Office of upper floor offices.

Camera 1 view of the "Kells Project" construction site
Camera 1 view of the "Kells Project" construction site

Evercam has installed two cameras on the site to record, and monitor the whole construction process of this large project as well as the demolition.

Camera 2 view of the "Kells Project" construction site
Camera 2 view of the "Kells Project" construction site
View Project
Fraser Rise
,
Australia
10/27/20

Aspire Estate

Residential

Simonds Homes has built an enviable reputation throughout our history for designing the finest homes in Australia. Their mission is not only to provide high quality, affordable homes for their clients in some of Australia's finest land developments but to ensure that, during their home building journey, they offer thorough and excellent customer support.

By launching the industry-leading "ASPIRE" house, Simonds Homes is committed to constantly breaking new ground in first home affordability.

The Aspire 174 has 4 bedrooms, 2 bathrooms, and a double garage with a large kitchen, meals, a living area that flows out to an alfresco area of 20sqm. The kitchen has extra bench space and the laundry is linked to a butler's pantry, perfect for entertaining. Ceilings are raised with an elegant square finish.

Knowing that families come in all shapes and sizes, the home has options to suit your lifestyle and needs. Building a house with Simonds Homes means that there's space for family moments together, in well-sized bedrooms or open plan living areas. With a beautiful alfresco and spaces just for the children, many of the Simonds homes designs bring the outside in, while parents can retire to calming, quieter spaces.

Swipe Left to Right to view construction progress from May 2020 to August 2020.

[[beforeafter]]

CGI Image of Simonds Homes
CGI Image of Simonds Homes
Floor Plan of "The Aspire"
Floor Plan of "The Aspire"
View Project
Bristol
,
United Kingdom
10/29/20

ZED PODs

Residential

Despite concerns about air quality for potential tenants, Bristol councilors have approved proposals for "peculiar" apartments in a Bristol car park.

The first experimental housing scheme to come out of the Bristol Housing Festival, the affordable one and two-bedroom flats are expected to be occupied by vulnerable young people handpicked by the YMCA.

CGI Image of The Zed Pods Bristol
CGI Image of The Zed Pods Bristol

The framework will deliver something genuinely revolutionary, a first for the city and its kind in the United Kingdom. This creative development would reinvent current land use in central Bristol, showcasing new strategies to help address the housing crisis while offering stunning, low-carbon housing at the same time.

Swipe Left and Right to view the construction progress from Aug 2020 to Oct 2020.

[[beforeafter]]

View Project
Harlesden
,
United Kingdom
9/14/20

Knowles House

Residential

Established in 1897, the Wates Group is one of the UK's leading private construction, development, and real estate services businesses.

In 2019 the Company produced £1.63bn in turnover. Wates was named Construction News Contractor of the Year in 2017; Building Magazines Major Contractor of the Year in 2016, and for the second time in 2016 was awarded the Queen's Award for Enterprise for Sustainable Development.

The Knowles House project is part of a three-year Temporary Accommodation Reform Plan for Brent Council to spend £130million on up to 600 new homes for vulnerable residents in the borough.

The Brent Council has awarded a £23.4 m contract to Wates Residential to build 149 new homes by December 2021. The redevelopment of the Knowles House in Harlesden will include the construction of two new buildings, which will provide 92 houses to be used as temporary accommodation and 57 independent living units to support some of the most vulnerable residents in the borough.

Swipe Left and Right to view the construction progress over the span of 5 months

[[beforeafter]]

Evercam has installed the cameras to record and monitor the building process of this project. Later these recordings and live views may be used for marketing purposes as well as to keep a record.

View Project
Dublin
,
Ireland
10/19/20

Bartra Poplar Row

Residential

This site was acquired by Bartra on Poplar Road, comprising 0.14ha/0.35acres, zoned Z4 (District Centre) with the objective: 'to have mixed-service facilities.' In this district residential is an acceptable application.

The place is approx. 750 m from Dart Station in Clontarf, and c. 1 km from Connolly Station and the Connolly Line at Luas. In addition, a number of QBC routes pass by the site on North Strand Road immediately.

The area is within the Electoral Districts' 500 m catchment, described by DCC as having "5000 + staff," and is therefore eminently suited to high-density residential development.

Bartra has started the process of design development and plans to seek a planning application for c. 34 Over 5/6 storey apartments on the building.

Camera view of the Bartra Poplar Row construction progress
Camera view of the construction progress by Evercam construction cameras
View Project
Donegal
,
Ireland
1/6/21

Ardara Distillery

Projects of Interest
Retail

Sliabh Liag Distillers became Donegal’s first distilling company for over 175 years, founded by returning scatterlings James and Moira Doherty, to reclaim Donegal’s rich distilling heritage.

Their An Dúlamán Distillery in Carrick, just 20 minutes from Ardara on the Wild Atlantic Way, is home to the company’s award-winning An Dúlamán Irish Maritime Gin, Assaranca Vodka, and The Legendary Silkie Irish Whiskey Collection.

CGI Image of Sliabh Liag Distillers

Construction of the Ardara Distillery began in 2020, led by James and Moira and their fellow founder, James Keith, with distilling operations due to begin in 2021.

The new €6.5m distillery aims to employ at least 40 people and will have the capacity to produce 400,000 litres of pure alcohol per annum, or 1.2m bottles. Alongside the distillation of gin and vodka, the Ardara Distillery will produce single malt and pot still whiskeys, heavily peated and authentic to the style of 19th century whiskeys from the county.

Follow the progress via live cam Sliabh Distillers website.

Camera view of Sliabh Liag Distillers

Follow @SliabhLiagDistillers for time lapse videos and updates

https://twitter.com/ArdaraDistilled/status/1340356402813034498

View Project
Kellystown
,
Ireland
1/13/21

Suir Engineering

Public Sector Utilities

Kellystown is located within easy commuting distance of Dublin City and Airport. Intel 1km, Leixlip 1.5km, Dublin City Centre 18 km, and Dublin Airport 25 km.

The Irish name for Kellystown is Baile Uí Cheallaigh.

Camera view of the construction process
Camera view of the construction process

See Your Project Clearly. Every Second, All the Time

Request a demo and see how continuous capture improves visibility, accountability, and outcomes on your next project.