How SunCode Energy is Boosting Operations Using Jobsite Cameras for Live Project Oversight

SunCode Energy partnered with Evercam to improve operational oversight on a remote battery energy storage project. By using jobsite cameras for continuous visual monitoring, the team reduced the need for site visits, improved stakeholder communication, and supported better decision-making. The solution enabled more efficient project tracking while lowering travel costs and operational overhead.

80%

Site visits reduced

$2,000+

Per visit savings

9 months

Remote monitoring

Industry

Utilities & Energy

Country

USA

Company type

Enterprise
Instructions
If you intend to use this component with Finsweet's Table of Contents attributes follow these steps:
  1. Remove the current class from the content27_link item as Webflows native current state will automatically be applied.
  2. To add interactions which automatically expand and collapse sections in the table of contents select the content27_h-trigger element, add an element trigger and select Mouse click (tap)
  3. For the 1st click select the custom animation Content 27 table of contents [Expand] and for the 2nd click select the custom animation Content 27 table of contents [Collapse].
  4. In the Trigger Settings, deselect all checkboxes other than Desktop and above. This disables the interaction on tablet and below to prevent bugs when scrolling.
Marilee Brewer

In this story

Marilee Brewer

Company Overview

SunCode Energy, a North American leader in renewable energy projects, specializes in solar and battery storage systems. They create innovative clean energy solutions and manage projects from development through construction and operation.

Battery energy storage system containers positioned on an outdoor renewable energy site.
3d rendering amount of energy storage systems or battery container units with solar and turbine farm

The Challenge

Oversight on Remote Battery Storage Project

While working on a standalone battery energy storage project, SunCode Energy faced the challenge of efficiently monitoring and managing the project remotely while keeping stakeholders informed throughout.

Key Details:

  • Urban location with limited site access
  • Need for continuous progress monitoring
  • Multiple stakeholders requiring updates
  • High travel costs for site visits

Managing the project remotely was complex. The team struggled to stay on top of on-site activities, and the lack of real-time monitoring slowed down quick decision-making, wasting time and resources.

Silhouette of electrical substation equipment with power lines and transformers at sunset.
Electrical infrastructure supporting renewable energy distribution

Silhouette of a electrical sub station, Energy and industry. distribution electric substation with power lines and transformers, at sunset

The Solution

Remote Visual Monitoring with Evercam

SunCode Energy implemented Evercam's remote monitoring system at their battery storage facility.

Key features that addressed their challenges included:

  • Round-the-clock view of the project site
  • Time-lapse videos documenting construction progress
  • Flexible access controls for stakeholder transparency and collaboration

The solution seamlessly integrated into their daily workflow, making routine daily live feed checks a standard practice. Access to the project footage was shared with the relevant project stakeholders, ensuring everyone was on the same page. According to the Alejandro, the camera feed became as easily accessible as email or calendar applications.

Benefits: Reduced Site Visits and Improved Communication

After nine months of using Evercam, SunCode Energy saw significant benefits:

  • Reduced site visits by 80%, saving over $2,000 per trip
  • Improved stakeholder communication and trust through shared visual updates
  • Enhanced progress tracking and reporting
  • Increased educational opportunities for team members and stakeholders

Results

Suncode Energy is now taking action in the following areas:

  • Considering the installation of multiple cameras at larger solar sites for comprehensive coverage and detailed monitoring.
  • Exploring the integration of AI and advanced analytics to enhance insights, inform decision-making, and enable predictive maintenance.
  • Continuing to leverage Evercam for effective stakeholder communication and project oversight, ensuring transparency and control.

The integration of live progress monitoring technology has significantly enhanced SunCode Energy's operations.

Battery storage units captured through a fixed camera providing remote site visibility.
Remote visual monitoring used across SunCode Energy projects.

Gain Full Visibility Across Your Energy Projects

Companies worldwide trust Evercam for enhanced project oversight and an empowered workforce. Learn how our AI-driven construction camera solutions can improve your operational efficiency and stakeholder communication.

Download this Case Study