How STT GDC Philippines Uses Evercam for Increased Safety and Faster Project Delivery

ST Telemedia Global Data Centres Philippines used Evercam to improve safety, visibility, and project delivery on the Fairview data centre campus. Continuous visual monitoring and BIM integration supported better coordination across teams, strengthened compliance, and enabled faster execution of critical construction activities on a complex data centre project.

7 → 3 days

Crane assembly

124MW

Site capacity

83,000 sqm

Campus size

Industry

Data Centers

Country

Philippines

Company type

Enterprise
Instructions
If you intend to use this component with Finsweet's Table of Contents attributes follow these steps:
  1. Remove the current class from the content27_link item as Webflows native current state will automatically be applied.
  2. To add interactions which automatically expand and collapse sections in the table of contents select the content27_h-trigger element, add an element trigger and select Mouse click (tap)
  3. For the 1st click select the custom animation Content 27 table of contents [Expand] and for the 2nd click select the custom animation Content 27 table of contents [Collapse].
  4. In the Trigger Settings, deselect all checkboxes other than Desktop and above. This disables the interaction on tablet and below to prevent bugs when scrolling.
Marilee Brewer

In this story

Marilee Brewer

A Benchmark for Data Centres

ST Telemedia Global Data Centres (Philippines) is a leading data centre provider operating out of Metro Manila, Philippines. With more than seven data centres established in the area, STT GDC Philippines delivers world-class infrastructure to hyperscalers, enterprises, and cloud service providers.

STT GDC Philippines faced the challenge of maintaining consistent quality standards across this enormous operation. Evercam has emerged as their critical visibility tool, transforming how project owners monitor construction, communicate with stakeholders, and ensure adherence to standards.

STT Fairview data centre campus under construction in Metro Manila.

Project Overview

STT Fairview 1 is a technological ecosystem designed to support 124MW of capacity upon completion, with Phase 1 delivering 28MW by Q2 2025. Managed through a joint venture between First Balfour and Leighton Asia, this pioneering facility sets new standards for sustainable infrastructure in the region. The project's commitment to 100% renewable energy and LEED Gold certification places additional demands on documentation and verification processes.

Top-down construction camera view of a multi-storey data centre structure surrounded by dense urban areas.
Aerial view showing construction progress at the STT Data Centre Campus

Challenges: The Complexity of Data Centre Construction

Data centre construction presents unique challenges that extend beyond typical building projects. For STT Fairview 1, these challenges manifested in several key areas:

Maintaining Consistent Quality and Safety Standards

With operations spanning multiple sites, maintaining uniform standards becomes exponentially more difficult. The technical complexity of the project also demanded extraordinary measures.

Engineering and Construction Complexities

This project required specialized construction techniques and advanced solutions to keep to its aggressive schedule.

Visibility and Stakeholder Communication

With investors based in Singapore and locally, plus potential customers tracking construction progress, establishing a reliable information flow was essential.

Construction workers and supervisors reviewing site conditions on an active data centre build.
On-site safety oversight supported by continuous visual monitoring.

Solutions: Leveraging Evercam for Sustainable Excellence

To address these multifaceted challenges, STT Fairview 1 implemented Evercam technology as their centralized visibility platform.

  • Comprehensive Site Monitoring
    With the ability to oversee operations remotely, project leaders could maintain control while optimizing their time and resources.
  • BIM Integration and 4D Visualization
    They used BIM Compare to overlay the 3D model with site progress, helping to identify discrepancies and create dynamic visualizations of the project timeline.
  • Enhanced Safety Protocols
    Evercam became the tool for proactively identifying hazards and reinforcing and verifying compliance as well as identifying areas of potential improvement.
  • Unified Communication Platform
    STT Fairview 1 was able to improve the understanding and communication between stakeholders, owners, and project teams by establishing Evercam as the single source of truth.

Results and Impact

  • Faster Critical Path Activities
  • Improved Safety Compliance
  • Reduced Site Visits
  • Streamlined Stakeholder Communication
Wide-angle view of a data centre construction site showing coordinated crane operations and ground activity.
Improved coordination across teams during data centre construction.

Setting New Standards for Data Centre Construction

STT Fairview 1 embodies a new approach to the complexity of data centre construction. Get all the details by downloading the Case Study below!