A Benchmark for Data Centres
ST Telemedia Global Data Centres (Philippines) is a leading data centre provider operating out of Metro Manila, Philippines. With more than seven data centres established in the area, STT GDC Philippines delivers world-class infrastructure to hyperscalers, enterprises, and cloud service providers.
STT GDC Philippines faced the challenge of maintaining consistent quality standards across this enormous operation. Evercam has emerged as their critical visibility tool, transforming how project owners monitor construction, communicate with stakeholders, and ensure adherence to standards.

Project Overview
STT Fairview 1 is a technological ecosystem designed to support 124MW of capacity upon completion, with Phase 1 delivering 28MW by Q2 2025. Managed through a joint venture between First Balfour and Leighton Asia, this pioneering facility sets new standards for sustainable infrastructure in the region. The project's commitment to 100% renewable energy and LEED Gold certification places additional demands on documentation and verification processes.

Challenges: The Complexity of Data Centre Construction
Data centre construction presents unique challenges that extend beyond typical building projects. For STT Fairview 1, these challenges manifested in several key areas:
Maintaining Consistent Quality and Safety Standards
With operations spanning multiple sites, maintaining uniform standards becomes exponentially more difficult. The technical complexity of the project also demanded extraordinary measures.
Engineering and Construction Complexities
This project required specialized construction techniques and advanced solutions to keep to its aggressive schedule.
Visibility and Stakeholder Communication
With investors based in Singapore and locally, plus potential customers tracking construction progress, establishing a reliable information flow was essential.

Solutions: Leveraging Evercam for Sustainable Excellence
To address these multifaceted challenges, STT Fairview 1 implemented Evercam technology as their centralized visibility platform.
- Comprehensive Site Monitoring
With the ability to oversee operations remotely, project leaders could maintain control while optimizing their time and resources. - BIM Integration and 4D Visualization
They used BIM Compare to overlay the 3D model with site progress, helping to identify discrepancies and create dynamic visualizations of the project timeline. - Enhanced Safety Protocols
Evercam became the tool for proactively identifying hazards and reinforcing and verifying compliance as well as identifying areas of potential improvement. - Unified Communication Platform
STT Fairview 1 was able to improve the understanding and communication between stakeholders, owners, and project teams by establishing Evercam as the single source of truth.

Results and Impact
- Faster Critical Path Activities
- Improved Safety Compliance
- Reduced Site Visits
- Streamlined Stakeholder Communication

Setting New Standards for Data Centre Construction
STT Fairview 1 embodies a new approach to the complexity of data centre construction. Get all the details by downloading the Case Study below!