East London Forensic Centre: Transforming Construction Management with Enhanced Visibility

The East London Forensic Centre project used Evercam to improve visibility and oversight across a complex, high-security construction site in the UK. Continuous visual monitoring supported safer workflows, clearer stakeholder communication, and more effective coordination between teams, helping maintain control and transparency throughout the construction process.

£70,000

Estimated ROI

3 hours

Saved per report

100-mile trips

Reduced site visits

Industry

Construction

Country

UK

Company type

Enterprise
Instructions
If you intend to use this component with Finsweet's Table of Contents attributes follow these steps:
  1. Remove the current class from the content27_link item as Webflows native current state will automatically be applied.
  2. To add interactions which automatically expand and collapse sections in the table of contents select the content27_h-trigger element, add an element trigger and select Mouse click (tap)
  3. For the 1st click select the custom animation Content 27 table of contents [Expand] and for the 2nd click select the custom animation Content 27 table of contents [Collapse].
  4. In the Trigger Settings, deselect all checkboxes other than Desktop and above. This disables the interaction on tablet and below to prevent bugs when scrolling.
Faith Tangara

In this story

Faith Tangara

The Impact of Live Site Visibility on East London Forensic Centre Construction

Project Overview

Challenged by the limitations of outdated facilities, and health and structural concerns, Waltham Forest Council initiated the construction of a modern, purpose-built mortuary equipped with a PMCT scanner.  This facility is designed to provide unique services in Greater London, distinguishing it as the only purpose-built mortuary south of the Midlands that meets modern standards.

Objectives and Challenges

The Council needed an innovative solution to manage the complex construction process. Handling communication among multiple stakeholders effectively was also a key concern for this project. Considering these challenges the stakeholders decided to use Evercam’s platform to improve construction monitoring, ensure comprehensive site visibility, and streamline progress reporting.

Construction workers installing modular building units on a secured healthcare construction site.
Modular units being installed during construction of the East London Forensic Centre.
Exterior view of the completed East London Forensic Centre building with brick façade and secure design features.
Completed exterior of the East London Forensic Centre facility.

Modern Site Monitoring and Reporting with Evercam

Before Evercam, site visits were frequent and required significant travel. The clerk of works and the senior project manager made trips of up to 100 miles. Evercam’s live site visibility and automatic daily progress photos via SnapMails changed this process. Remote monitoring significantly reduced the need for physical visits. This real-time capability was particularly helpful for team members in Essex and London. It saved substantial time and travel costs.

https://player.vimeo.com/video/920533055?h=05735f2282&dnt=1&app_id=122963

The real-time monitoring capability of the camera system was particularly beneficial for team members who previously had to travel long distances. The use of the camera reduced the frequency of their visits, saving time and resources, while still keeping them well-informed about the project’s progress
~Council Senior Project Manager

Improved Efficiency and Stakeholder Communication

Evercam’s platform significantly streamlined reporting and presentation preparation. The ability to create custom time-lapse videos reduced the project manager’s preparation time by three hours per presentation. This enhancement improved the effectiveness of stakeholder meetings.

Real-Time Visuals for Faster Decision-Making

During construction, the team faced a delay in drainage works. Evercam’s real-time monitoring allowed them to track progress and adjust schedules proactively. This kept the project on track and optimized resource use.

The drainage posed a concern for us due to a slight delay. However, we were able to monitor the situation before the delivery of the modular units, gaining insight into the current status and identifying where adjustments were needed within the next 10 days.~Ashana Jones Council Senior Project Manager.

Construction workers wearing protective equipment lifting and positioning building materials within a secured site.
On-site teams coordinating safe material handling during construction.

Return on Investment

The implementation of the Evercam system decreased the need for frequent site visits, saving both travel costs and time. Its capability to continue recording during power interruptions enhanced site security and aided law enforcement and insurance efforts, resulting in the recovery of stolen goods. Additionally, the system introduced efficiencies that saved the project team three hours per presentation, enhancing the quality and impact of stakeholder meetings. Overall, the estimated ROI from these improvements is £70,000.

The East London Forensic Centre project exemplifies how advanced technology like Evercam platform can transform project management in the construction industry, enhancing efficiency, security, and stakeholder communication.

Download This Case Study