Top Construction Timelapses of the Month

Top Construction Timelapse videos of the Month produced by Evercam time-lapse cameras. book a demo now to discover how our features can help you in your project.

Instructions
If you intend to use this component with Finsweet's Table of Contents attributes follow these steps:
  1. Remove the current class from the content27_link item as Webflows native current state will automatically be applied.
  2. To add interactions which automatically expand and collapse sections in the table of contents select the content27_h-trigger element, add an element trigger and select Mouse click (tap)
  3. For the 1st click select the custom animation Content 27 table of contents [Expand] and for the 2nd click select the custom animation Content 27 table of contents [Collapse].
  4. In the Trigger Settings, deselect all checkboxes other than Desktop and above. This disables the interaction on tablet and below to prevent bugs when scrolling.
Erika Gomes

Table of contents

Erika Gomes

Check out the latest time-lapse videos produced by Evercam capturing construction progress from a range of projects across the globe.

Greystones, Ireland Modular School Time-lapse

We are delighted to be working on this exciting new school project in Greystones, Co. Wicklow with our valued client Cpac Modular - Ireland's Original Hybrid Modular supplier.

The 3,174sqm hybrid modular building is a two-storey secondary school with top-class facilities, consisting of 16 standard classrooms, as well as specific classrooms for Construction Studies, Technology, Art, Home Economics, Science, and Special Educational Needs.

Situated on the Grounds of �ire �g Greystones GAA Club on Mill Road, this superb school development also has a staff room, admin & principal offices, 5 WCs, and an elevator.

Greystones, Ireland Modular School Time-lapse

Progress of the Baird Family Hospital

The Baird Family Hospital and The ANCHOR Centre Project is a �233.2 million building development at the Foresterhill Health Campus in Aberdeen, Scotland. This exciting project will result in two new buildings being opened on the site in 2023 to support and enhance the provision of clinical care. Both buildings will include state-of-the-art research and teaching facilities and will offer person-centred environment of care.

This timelapse video shows the progression and completion of the different sections of the building by GRAHAM.

Showing the completion of the foundations and drainage throughout sections 1, 2 , 3 & 4, we can see the progression of the superstructure works; waterproofing, reinforcing, and the pouring of the lower ground slab.

Continuation of the substructure works is also shown, including; excavating the piles, reinforcing & pouring of the foundations, drainage & preparing the area for waterproofing.

Progress of the Baird Family Hospital

Stafford Bonded, Waterford Whiskey Maturation Warehouse Development

Stafford Bonded is an Irish family business dealing in the bonded warehousing and distribution of wines, beers & spirits in Wexford, Ireland.

The time-lapse�reveals the�progress on Phase 3 of the construction�of 11 x 1000 sq. mt�whiskey maturation warehouses.

Stafford Bonded, Waterford Whiskey Maturation Warehouse Development

Milestone time-lapse for Duo Group

Wacht the Beam installation on the Ballyclare Bridge Project:

Milestone time-lapse for Duo Group